UofL Today: Come test drive our new site

Road work to start Aug. 17

August 10th, 2009

Road work at I-65 North and Warnock Avenue will begin Aug. 17, according to the Kentucky Transportation Cabinet.

Some work will take place during that day, but there will be no intersection closures.

However, at 7 p.m., I-65 Exit 133B to Eastern Parkway and Warnock Avenue between Crittenden Drive and Arthur Street will be closed.

Detour signs will direct people coming from the south via I-65 around the Warnock Avenue and I-65 construction zone.

At the same time, Hahn Street, which connects Eastern Parkway and Floyd Street, will be closed for paving.

Weather permitting; all closure work will be complete by 6 a.m., Monday, Aug. 31.

I-65 Detour

To get to the north end of campus (for residence hall access)

  • Take Exit 133A at Eastern Parkway
  • Turn Left on Bradley Avenue
  • Turn Left on East Brandeis
  • East Brandeis becomes Cardinal Boulevard

To get to mid-campus (for access to South Brook Street and Floyd Street)

  • Take Exit 133A at Eastern Parkway
  • Turn Left on Bradley Avenue
  • Turn Left on East Brandeis
  • Turn Left on Arthur Street
  • Turn Right on Warnock Avenue

To get to south campus (for access to Eastern Parkway)

  • Take Exit 133A at Eastern Parkway
  • Turn Left on Bradley Avenue
  • Turn Left on East Brandeis
  • Turn Left on Arthur Street
  • Turn Right on Eastern Parkway

To Avoid Hahn Street

To get to parking at Papa John’s Cardinal Stadium coming from the east via Eastern Parkway:

  • Turn Left onto Crittenden Drive
  • Turn Right onto Central Avenue
  • Turn Right onto Floyd Street

Full details on the extent of the road work

News Home


Top of Page